Application Report #4 (Pumps and Sliding Frame)

 

When construction finally wraps up in 2010 and the last of four hot wind-box fluid bed incinerators is online, the GEB facility will be one of the largest and most modern wastewater treatment plants of its type in the world.

Capacities will have been increased from 336 Megalitres/day (MLD) [89 million gallons/day (MGD)] to 516 MLD (136 MGD) – enough additional capacity to see the Region of Peel into 2031.

 