{"id":3551,"date":"2023-04-28T15:00:59","date_gmt":"2023-04-28T20:00:59","guid":{"rendered":"https:\/\/www.schwingbioset.com\/?p=3551"},"modified":"2023-07-14T13:41:44","modified_gmt":"2023-07-14T18:41:44","slug":"cost-savings-schwing-bioset-screw-presses-bigcreek-wrf","status":"publish","type":"post","link":"https:\/\/www.schwingbioset.com\/es\/cost-savings-schwing-bioset-screw-presses-bigcreek-wrf\/","title":{"rendered":"Cost Savings with Schwing Bioset Screw Presses at Big Creek WRF are Notable"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;0px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; width=&#8221;100%&#8221; max_width=&#8221;2560px&#8221; custom_padding=&#8221;0px||||false|false&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.21.0&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p><em>Escrito por Tom Welch<\/em><\/p>\n<p>The Big Creek Water Reclamation Facility is located in North Fulton County, on the north side of Atlanta within the Big Creek Basin.<\/p>\n<p>Big Creek WRF is the largest Water Reclamation Facility in regards to both flow and service area in North Fulton County. The service area is approximately 70 square miles and includes Roswell, Alpharetta, portions of Milton, and areas of Cobb and Forsyth Counties. The facility was originally constructed in 1969 with a treatment capacity of 0.75 MGD (million gallons per day). Several upgrades and expansions have been completed on the facility to its current permitted treatment capacity of 32 MGD.<\/p>\n<p>Due to the Metropolitan North Georgia Water Planning District forecast, which takes the continued population growth and economic development of the service area into account, the facility requires additional capacity to meet the growing wastewater treatment demands.\u00a0 The project will include a phased expansion from the 32 MGD to 38 MGD (Maximum Month) while implementing new membrane bioreactor (MBR) technology to achieve more stringent discharge levels required by the new permit.\u00a0 New biological nutrient removal (BNR) basins and membrane trains (together comprising the MBR system), and new aerobic digesters will be constructed for the full capacity.<\/p>\n<p>The multi-phase construction started in 2020 and is expected to be completed in mid-2024.\u00a0 A new dewatering building, featuring some of the largest screw presses in North America, was built in phase two and commissioned in May of 2022.\u00a0 This new dewatering building showcases two of Schwing Bioset\u2019s model FSP 1203 screw presses.\u00a0 Each Press has a 1200 mm screw diameter and is capable of a throughput of 2600 dry pounds per hour of aerobically digested sludge.\u00a0 These two new presses were designed to replace the existing five smaller screw presses, the largest available from that manufacturer, with 800 mm diameter screws.\u00a0 For comparison, the older presses were typically run at a maximum throughput of 550 dry pounds per hour, dewatering WAS sludge.<\/p>\n<p>Veolia operates the Fulton County Big Creek facility, including the dewatering facility.\u00a0 The FSP 1203 screw presses are dewatering WAS sludge currently, and each machine is running as high as 250 gpm of 1% feed solids.\u00a0 The equipment is operated about 18 hours a day, 5 to 6 days a week, and a total of five, 25-ton trailers, are hauled to the local landfills each day.\u00a0 Each FSP 1203 screw press is only operating at 50% of the design capacity.\u00a0 The facility is designed to accommodate a total of five FSP 1203 machines in the future.\u00a0 Schwing Bioset\u2019s high-performance design produces the highest throughput, most efficient screw presses in the dewatering market, and these two FSP 1203 machines are examples of that.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium\" src=\"https:\/\/www.schwingbioset.com\/wp-content\/uploads\/2023\/03\/Fulton-County-Screw-Presses_cropped.jpg\" alt=\"Two New Schwing Bioset Screw Presses at Big Creek Water Reclamation Facility\" width=\"1764\" height=\"1040\" \/><\/p>\n<p>The new Schwing Bioset FSP 1203 presses are currently processing WAS.\u00a0 Once the new MBR trains and digesters are completed, and the volatile solids are lowered to the new design levels, consistent dewatered solids will be able to be maintained in the low 20% range. Final acceptance testing will be performed after the completion of the new digesters in mid-2024.<\/p>\n<p>Tipping fees at the local landfills have increased dramatically over the last several years, with an average tipping fee being $80\/ wet ton.\u00a0 Hauling less water to the landfill provides significant savings in disposal costs of dewatered solids.\u00a0 The new Schwing Bioset FSP 1203 screw presses are expected to save approximately 20% from the current landfilling costs once the project is complete.\u00a0 Additional savings afforded by the 1203 presses include:<\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Electrical consumption is reduced as the two screw presses have roughly 50% less connected horsepower than the equivalent number of 800mm machines for the same processing capacity.<\/li>\n<li>Maintenance requirements are reduced with fewer machines to manage, freeing maintenance staff for other activities within the plant.<\/li>\n<li>Building size to house equipment is reduced saving construction costs.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The overall project has been a success and is another prime example that illustrates the clear differences in capabilities between Schwing Bioset\u2019s screw presses and legacy equipment in the market.\u00a0 Contact us today to learn how a high-performance screw press built by Schwing Bioset can help you save costs on your next large dewatering project.<\/p>\n<p><span style=\"text-decoration: underline;\"><span style=\"color: #339966; text-decoration: underline;\"><strong><a style=\"color: #339966; text-decoration: underline;\" href=\"https:\/\/www.schwingbioset.com\/es\/contact\/\" target=\"_blank\" rel=\"noopener\">Cont\u00e1ctenos<\/a><\/strong><\/span><\/span> today to learn how a high-performance screw press built by Schwing Bioset can help you save costs on your next large dewatering project or <a href=\"https:\/\/www.schwingbioset.com\/es\/\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"color: #339966;\"><b><u>Visite nuestro sitio web<\/u><\/b><\/span><\/a>\u00a0to read more about our products and solutions.<\/p>\n<p>&nbsp;<\/p>\n<a href='https:\/\/www.schwingbioset.com\/es\/downloads\/' class='small-button smallsilver' target=\"_blank\">Descargue nuestros folletos e informes de aplicaciones<\/a>\n<a href='https:\/\/www.schwingbioset.com\/es\/news-subscribe\/' class='small-button smallsilver' target=\"_blank\">Subscribe to Start Receiving Schwing Bioset eNews<\/a>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>","protected":false},"excerpt":{"rendered":"<p>Written by Tom Welch The Big Creek Water Reclamation Facility is located in North Fulton County, on the north side of Atlanta within the Big Creek Basin. Big Creek WRF is the largest Water Reclamation Facility in regards to both flow and service area in North Fulton County. The service area is approximately 70 square [&hellip;]<\/p>","protected":false},"author":3,"featured_media":3550,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<em>Written by Tom Welch<\/em>\r\n\r\nThe Big Creek Water Reclamation Facility is located in North Fulton County, on the north side of Atlanta, within the Big Creek Basin.\u00a0Big Creek WRF serves the largest service area total flow of treatment facilities in North Fulton County. The service area is approximately 70 square miles and includes Roswell, Alpharetta, portions of Milton, and areas of Cobb and Forsyth Counties. The facility was originally constructed in 1969 with a treatment capacity of 0.75 MGD (million gallons per day). Several upgrades and expansions have been completed on the facility to its current permitted treatment capacity of 24 MGD.\r\n\r\nDue to the Metropolitan North Georgia Water Planning District forecast, which takes the continued population growth and economic development of the service area into account, the facility requires additional capacity to meet the growing wastewater treatment demands. The project will include a phased expansion from the 24 MGD to 38 MGD (Maximum Month) while implementing new membrane bioreactor (MBR) technology to achieve more stringent discharge levels required by the new permit. New biological nutrient removal (BNR) basins and membrane trains (together comprising the MBR system) will be constructed for the full capacity.\r\n\r\nThe multi-phase construction started in 2020 and is expected to be completed in mid-2024. A new dewatering building, featuring some of the largest screw presses in North America, was built in phase two and commissioned in May of 2022. This new dewatering building showcases two of Schwing Bioset\u2019s model FSP 1203 screw presses. Each Press has a 1200 mm screw diameter and is capable of a throughput of 2600 dry pounds per hour of aerobically digested sludge. These two new presses were designed to replace the existing five smaller screw presses, the largest available from that manufacturer, with 800 mm diameter screws. For comparison, the older presses were typically run at a maximum throughput of 550 dry pounds per hour, dewatering WAS sludge.\r\n\r\nVeolia operates the Fulton County Big Creek facility, including the dewatering facility. The FSP 1203 screw presses are dewatering WAS sludge currently, and each machine is running about 300 gpm of 1% feed solids. The equipment is operated about 18 hours a day, 5 to 6 days a week, and a total of five, 25 ton trailers, are hauled to the local landfills each day. Each FSP 1203 screw press is only operating at 50% of the design capacity, with plenty of capacity left to meet the future demands of the full plant expansion. Schwing Bioset\u2019s high-performance design produces the highest throughput, most efficient screw presses in the dewatering market, and these two FSP 1203 machines are delivering what they were designed to do.\r\n\r\n<img class=\"alignnone size-medium\" src=\"https:\/\/www.schwingbioset.com\/wp-content\/uploads\/2023\/03\/Fulton-County-Screw-Presses_cropped.jpg\" alt=\"Two New Schwing Bioset Screw Presses at Big Creek Water Reclamation Facility\" width=\"1764\" height=\"1040\" \/>\r\n\r\nThe previous 800 mm screw presses typically produced dewatered solids in the range from 14-18% solids from WAS sludge. The new Schwing Bioset FSP 1203 presses produce on average 20% output solids currently processing WAS, and often much higher than that. Once the new MBR trains are completed, and the volatile solids are lowered to the new design levels, consistent dewatered solids will be able to be maintained in the low 20% range, even at the elevated design output of 2600 dry pounds per hour, which is almost twice the current throughput of the new machines.\r\n\r\nTipping fees at the local landfills have increased dramatically over the last several years, with an average tipping fee being $80\/wet ton. Hauling less water to the landfill provides significant savings in disposal costs of dewatered solids. The new Schwing Bioset FSP 1203 screw presses dewater the biosolids to an average of 20% output solids. The old screw press technology only dewatered the biosolids to an average of 16% output solids. The cost savings of the larger machines and higher dry solids content produced by the Schwing Bioset screw presses are notable:\r\n<ul>\r\n \t<li style=\"list-style-type: none;\">\r\n<ul>\r\n \t<li>The increase in solids content reduces tipping fees at the landfill by $650,000 - $800,000 per year depending on operating schedule.<\/li>\r\n \t<li>Hauling costs are also reduced as one less truck per day is necessary, providing further savings and reducing greenhouse gas emissions.<\/li>\r\n \t<li>Electrical consumption is reduced as the two screw presses have roughly 50% less connected horsepower than the equivalent number of 800 mm machines for the same processing capacity.<\/li>\r\n \t<li>Maintenance requirements are reduced with fewer machines to manage, freeing maintenance staff for other activities within the plant.<\/li>\r\n \t<li>Building size to house equipment is reduced saving construction costs.<\/li>\r\n<\/ul>\r\n<\/li>\r\n<\/ul>\r\nThe overall project has been a success and is another prime example that illustrates the clear differences in capabilities between Schwing Bioset\u2019s screw presses and legacy equipment in the market.\r\n\r\n<span style=\"text-decoration: underline;\"><span style=\"color: #339966; text-decoration: underline;\"><strong><a style=\"color: #339966; text-decoration: underline;\" href=\"https:\/\/www.schwingbioset.com\/contact\/\" target=\"_blank\" rel=\"noopener\">Contact us<\/a><\/strong><\/span><\/span> today to learn how a high-performance screw press built by Schwing Bioset can help you save costs on your next large dewatering project or <a href=\"https:\/\/www.schwingbioset.com\/\" target=\"_blank\" rel=\"nofollow noopener\"><span style=\"color: #339966;\"><b><u>visit our website<\/u><\/b><\/span><\/a>\u00a0to read more about our products and solutions.\r\n\r\n\u00a0\r\n\r\n[button link=\"https:\/\/www.schwingbioset.com\/downloads\/\" color=\"silver\" newwindow=\"yes\"] Download Our Brochures and Application Reports[\/button]\r\n\r\n[button link=\"https:\/\/www.schwingbioset.com\/news\/\" color=\"silver\" newwindow=\"yes\"] Read More Blog Articles from Schwing Bioset[\/button]","_et_gb_content_width":"","content-type":"","footnotes":""},"categories":[16,286,278],"tags":[190,189,175],"class_list":["post-3551","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-municipal","category-screw-press","tag-dewatering","tag-screw-press","tag-water-reclamation-facility"],"_links":{"self":[{"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/posts\/3551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/comments?post=3551"}],"version-history":[{"count":0,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/posts\/3551\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/media\/3550"}],"wp:attachment":[{"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/media?parent=3551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/categories?post=3551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.schwingbioset.com\/es\/wp-json\/wp\/v2\/tags?post=3551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}